The path contractors have returned to the summit of Roseberry Topping, and this time they have brought a machine worth stopping for.

It is a walking “spider” excavator. Its four legs articulate independently, so the cab stays roughly level whatever the gradient. Only the rear two legs carry wheels here, as the front wheels have been removed. To climb, the driver stretches the jib to its limit and digs the bucket into the hillside. The front legs lift, and the machine hauls itself up the near vertical slope with the bucket as its anchor. Down go the front legs, out goes the jib, and the whole business starts again. Leeches and earthworms crawl in much the same way, though neither has ever been seen carrying a cab.
I cannot imagine how it manages a three-point turn.
The contractors are working on a badly eroded gully, a shortcut worn into the hill by years of walkers’ boots. Making the gully less inviting should send walkers up the newly graded path instead, which is the hope, at any rate. Walkers have a long record of preferring the directissimo way.

Leave a Reply