Construction work by the National Trust at Cod Beck. The aim is to create a circular wheelchair accessible path around the reservoir. Yorkshire Water has upgraded the existing paths and gates and plan to install a new bridge just beyond the far side of the tree left of centre. Rangers and volunteers of the National Trust are creating a new path to link up to the proposed bridge. Currently, access across Cod Beck should be by stepping stones but these were mostly submerged today.
Leave a Reply