It was supposed to be ready for the October half term, last year. But, better late than never, I was pleased to see the bridge in use. I understood the idea was to produce a wheelchair accessible route around Cod Beck Reservoir but the installed kissing gate looks to me to be too narrow. Maybe it’s a temporary gate as there is still the problem of the steps to negotiate. For an Easter Saturday not many people around, but then it’s been a day of constant rain.
Leave a Reply